Dewatering & Shoring

  1. Home
  2. Services
  3. Dewatering & Shoring

MAG Unified provides specialized Dewatering & Shoring services, which are critical, non-negotiable elements of deep excavation for foundations, basements, and subterranean structures across the Middle East. In coastal and high-water-table areas common in the region, effective groundwater control and stable excavation walls are essential for the safe and successful construction of high-value assets like Sea Water Pump Stations, multi-level basements for High-Rise Buildings, and deep industrial pits.

Our unified engineering approach manages the complex geotechnical risks associated with deep digging, ensuring a stable, dry working environment for foundation construction.

Dewatering: Controlling Groundwater Ingress

Effective dewatering is crucial to maintaining the stability of the excavation base and preventing soil disturbances:

 
  • Groundwater Control: Installation and operation of various dewatering systems, including wellpoint systems, deep wells, and ejector systems, tailored to specific soil conditions and required drawdown depths.

     
  • Drawdown Management: Meticulous monitoring and management of groundwater levels to ensure the excavation base is stable and dry for critical concrete works, particularly for structures like the Wet Wells of Pump Stations.

  • Discharge Compliance: Safe and regulated discharge of pumped water, adhering to all local environmental regulations in the Middle East.

Shoring: Stabilizing Excavation Walls

Shoring provides necessary structural support to the vertical excavation walls, preventing collapse and protecting adjacent structures:

 
  • Retaining Systems: Design and installation of temporary retaining structures, including secant pile walls, sheet pile walls, soldier pile and lagging systems, and diaphragm walls.

  • Bracing and Anchoring: Installation of internal bracing (struts) or external ground anchors to provide lateral support to the shoring system, ensuring maximum safety and stability for deep, large-area excavations.

  • Integration: Seamless coordination of shoring installation with other foundational elements, such as the initial phases of our Piling & Stabilization Works for high-rise projects.

By partnering with MAG Unified, you secure a highly specialized, unified partner that manages the intricate and high-risk process of Dewatering & Shoring, guaranteeing a safe, stable, and dry environment for the successful construction of your deep foundations and subterranean structures across the Middle East.

Let's bulid something great together!

Ensure the stability of your deep excavations. Contact MAG Unified for expert Dewatering and Shoring solutions.